IT has confirmed that an underground fiber cut was the cause of the network outage in the Dowling and Hitchcock buildings. Network connectivity has now been restored to both locations. IT Support has checked both buildings to verify connectivity and ensure that learning environments are fully operational.
Network connectivity to the pedestrian bridge is offline at his time. Connectivity is expected to be restored later this morning.